Project tabs

Items tab

The project's work. Tasks, questions and decisions in a milestone tree, the RAID log, and the Config items of the system build.

The Items tab is where the team works the plan day to day. The tab's number is open questions plus open tasks.

Items has two sub-tabs, each with its count:

  • Project: the work and the RAID log.
  • Config: the system build's items: plans, components, data, interfaces and test cases.

Work

Under Project, the Work view holds three types of item in one tree:

  • Task: something to do. It is done when the work is done.
  • Question: something that needs an answer. It reads Needs answer until someone answers it, then Answered. A question can carry a recommendation, shown as a Recommended badge.
  • Decision: what was settled. It reads Decided, and the plan should reflect it. See Questions and decisions.

On a Managed service, this view is called Requests.

The milestone tree

By milestone (the default) shows the work as a tree:

  • each milestone is a section,
  • under it, the deliverables due at that milestone,
  • under each deliverable, its tasks, questions and decisions.

Items that belong to a milestone but to none of its deliverables sit under General. Items that belong to no milestone sit under Not in a milestone.

Each milestone shows its progress ("3 of 5 done") and a status:

StatusMeaning
OpenWork is under way.
At riskAn item under it is late, or due after it, or it waits on a question.
OverdueThe milestone date has passed.
Ready to completeAll the work under it is done. Closing it is still a person's call.
CompleteIt is closed.

A deliverable whose work is all done reads Ready to deliver. The project lead closes them with Complete (milestone) or Mark delivered (deliverable) on the row.

Red means late, amber means at risk or waiting on a question, and green means ready to close.

Due switches the tree to one flat list, soonest due first.

Filter the work

  • Outstanding (the default), Done or All.
  • All assignees, Me, Unassigned, or one person.
  • Overdue, when anything is overdue.

Filters are kept in the page address, so you can share a filtered view.

Add work

  • New task adds a task. On a milestone or deliverable row, New task here adds one under it.
  • The menu beside New task has New question.

File work under a deliverable

Filing puts an item in its place in the tree. If you can write to the project, you can file in three ways:

  • Drag an item row onto a milestone, a deliverable or a General row. Drag it onto Not in a milestone to unfile it.
  • Click File under… on the row, or press m on a focused row, and pick a place from the searchable list. Not filed unfiles it.
  • In the item pane, use File under… in the footer.

The project lead also gets Suggest filing on Not in a milestone. The agent proposes a place for each unfiled open item it is sure of, and stages those filings on Events. Nothing moves until the lead approves them.

See File work under a deliverable.

RAID

The RAID view lists the project's risks, assumptions, issues and dependencies (and constraints), even when they are about the build. Click a row to open it in the item pane. New RAID rows come from Sync, from Move to RAID on a question, or from Stage a change. Management shows the same log with its open count.

Config

Config has a List view of every Config item with its status: Plan, Component, Data, Interface and Test case.

On an Implementation, System build shows a read-only picture of the build design: what is designed in each layer, the gaps, and when the build last changed. The design itself is edited in Blue Accelerate: use Open in Blue Accelerate. On a Managed service this view is called Blueprint and shows the blueprint of the Implementation it builds on. An Advisory has no system build.

See Blue Accelerate.

Open an item

Click any row to open it in the item pane beside the list. The open item is part of the page address, so a notification or a shared link opens it directly.