Add a meeting's notes to a project, let Sync read them, and review what it proposes.

This is the everyday loop on a project: a meeting happens, its notes go into Knowledge, Sync reads them, and the project lead reviews what changed.

Before you start

  • You are on the project's team (to add and sync) or its lead (to review).
  • To pull a meeting straight from Granola or Microsoft 365, connect it once on Knowledge Base › Connections › Connectors to Infra.

Add the meeting to Knowledge

Open the project's Knowledge tab and click Add. Set Type to Meeting note, then upload a Markdown file or paste the notes, and click Add + index.

Or ask the project agent (⌘J): "Stage Tuesday's status call with Priya Shah from Granola." The agent finds the meeting and copies its notes, and its transcript when there is one, onto the project.

Run Sync

Open the Events tab. The Sync bar says how many documents are new, for example "1 document new since last sync". Click Sync.

The progress list shows the document as Reading, then Read with what it changed, for example "answers DEC-015; adds 2 tasks; 1 conflict".

Review the rows

The new rows appear under the meeting, grouped by area: Work, Plan, Risks and so on. Click a row to open it in the item pane and check the quote it came from.

  • If a detail is wrong (an owner, a date), use Edit before approving.
  • If a row sits under Needs a look as Which item?, pick the item it is about in the pane.

Approve or dismiss

As the lead, click Approve or Dismiss on each row, or press A or D. To review a whole area at once, use Approve group or Dismiss group.

Approved changes land on Items and Plan. The meeting's facts also show on its Summary layer in Knowledge.

Not the lead? You can still add and Sync. The rows wait for the lead, and the Events tab shows how many are waiting.