Overview tab

A project's state on one screen. Health, status and progress, the timeline, what needs attention, the team and the build product.

The Overview tab answers "where does this project stand?" Each section links to the tab that owns the detail. You do not edit the plan here.

Health

Health is one sentence, computed from the plan, hours and dates. Nobody sets it by hand. For example:

Off track — scope: 33 requirements have no deliverable. Schedule at risk: 1 milestone overdue. Budget on track: 6 of 195 hours (3%).

"At risk" shows in amber and "off track" in red. What each part reads depends on the project kind. The Management link opens the detail.

Under the sentence:

  • Status follows the milestones: Planning until one is complete, Completed when all are.
  • Progress is the share of milestones complete, for example "40% · 2 of 5 milestones". Proposed and cancelled milestones do not count.

Timeline

The Timeline chart shows the project's milestones, deliverables and other dated items in lanes. Use the zoom controls, Today and Fit in its header. Click an item to open it in the item pane.

Needs attention

Needs attention says, in up to three short sentences:

  • how many changes wait for review, and where they came from (for example "from 2 meetings and 1 added by hand"). This is the one amber signal.
  • the open decisions, naming the first three.
  • how many changes have no source. Click to see them, and attach a source to them.

It also says when documents are waiting that no Sync has read yet. When there is nothing, it reads "Nothing needs attention."

Scope and delivery changes

Scope and delivery changes is a log of the last 7 days, newest first. A batch approved from one Sync, or a run of edits by one person on one day, reads as one line you can expand. Each change opens its item in the item pane.

BRD and test cases

BRD and test cases shows where the BRD stands next to its drafts, and the project's platform.

  • Generate draft writes a BRD draft from the project's documents, with live progress. A long draft can stop part way; Resume draft continues it and keeps what was written.
  • Each draft lists its requirements and test cases, and changes since sign-off.
  • An approver can Promote a draft to be the current BRD. A draft never replaces the BRD by itself, and never after sign-off.

Team

Team shows both sides of the project:

  • BHG: the project team, lead first, with each person's role and hours logged against planned. You edit the BHG team on Management.
  • Client: the client's people, with their role, email and how many client actions wait on them. Add, edit or remove a client contact here. A lead's edit applies at once; anyone else's waits on Events. Sync also adds people a document names, for the lead to accept.

Build product

The last section follows the project kind:

  • Advisory: Build product: BRD, with the BRD's status and Start implementation from this BRD.
  • Implementation: Build design, with what is designed so far (for example "4 plans · 11 components") and a Blue Accelerate link. If the project builds on an Advisory, it names that Advisory's BRD.
  • Managed service: Blueprint from the Implementation it builds on, with a Blue Accelerate link.